EDMOND, OKLAHOMA–
St. Luke’s United Methodist Church chose Edmond-based, Noah’s Park &
Playgrounds, to design and install four new indoor and outdoor playground
structures for their new Edmond campus building located at 900 N. Sooner Road
(west side of I-35 in Edmond, OK.).
On Sunday, October
16th, after a long, exciting wait, St. Luke’s United Methodist
Church will finally open its doors to both current, and hopefully new members,
to its brand new, beautiful, Edmond campus building, complete with four new
playground structures, all designed and installed by Noah’s Park &
Playgrounds.
When starting the
new-campus building process, the church leaders knew it was important, for both
church members, the campus’ on-site Child Development Center, and Edmond
families, that an indoor and outdoor playground could be very beneficial and
help build a foundation of excitement and play for children of all ages. That’s
when they turned to the playground experts at Noah’s Park & Playgrounds to
help with the design and installation process.
Noah’s Park &
Playgrounds’ sales and design team presented the church leaders with many
customizable options for the three outdoor playgrounds. After only 2 to 3 color
and component design revisions, the church leaders landed on purchasing three outdoor,
custom playground structures for ages 6-24 months, 2-5 years, and 5-12 years of
age, matching in a blue, green and red color scheme as well as a one-of-a-kind
indoor playground designed for children age 2-12 years of age.
The 6-24 month old, outside playground
area is perfect for children who are crawling, new-walkers, or children who are
in need of ADA accessible playground equipment. This ground level panel
structure is complete with a crawl tube, drum panel,
gear panel, tic-tac-toe panel, bench panel, bubble panel, store front panel,
car panel and captain’s wheel, all perfect for early childhood developmental
stage learning.
The 6’
tall ADA accessible, custom 2-5 year age playground is completed with an ADA
transfer station, straight tube slide, double bedway straight slide, pod
climber, ladder climber, bubble panel and store front panel.
The 14’
tall ADA accessible, custom 5-12 year age playground is completed with an ADA
transfer station, single right curve slide, two spiral slides, double bedway
right curve slide, railing ladder climber, leaf climber, angled rock climber,
rock climber, rope C climber, spiral step climber, bone bridge, tic-tac-toe
panel, clock panel and gear panel.
Along with the
three structures to accommodate children of all ages, the church purchased
Xccent’s Monarch Climber and the Periwinkle Rocker for the 2-5 and 5-12 age
playground areas. The church topped off the entire outdoor playground site with
thick, 2 1/8” padded, green Thatch Turf surfacing, and four custom sail shades
in sandstone and blue, which will help shade all of the playgrounds during hot
summer, Oklahoma days.
Specializing in indoor playgrounds,
Atomic Playgrounds worked with Noah’s sales team to present St. Luke’s leaders
an indoor playground that will work for children of all ages at the church and
the surrounding community. This three level indoor playground is completed with
and ADA accessible station, two wavy straight slides, mini double slide, crawl
tubes with lookouts, punching bags, two moon walk climbers, a zig-zag climber,
twist n’ tangle, a cave crawl, web platforms, web levels, spider maze panel and
clubhouse section.
In addition to the indoor playground,
the church completed the play area with an Everlast 10’
Standard Climbing Wall, with red safety mats for fall protection.
“The kids
absolutely love all the playgrounds,” says St. Luke’s Pastor of Campus
Operations, Drew Haynes. “In fact, I think parents are happy their kids love
all the playgrounds, but they’re not happy with how hard it is to get their
kids to leave! We believe it is important to invest in our children’s
spiritually, emotionally, intellectually and physically, and Noah’s helped us
towards accomplishing that mission.”
Noah’s Park &
Playgrounds’ installation crew, with the help of Atomic’s indoor playground
installation crew, built all four indoor and outdoor custom playgrounds this
past August and September, just in time for the churches grand opening in
mid-October.
To see all of the project details, pictures and videos, go to the St. Luke’s UMC Project Portfolio on our website