Project Details:
Structure– Custom 5-12 age playground structure in brown, tan and rainforest green. Structure complete with ADA transfer station, spiral slide, right-curve slide, rock climbing wall, rock climber, pod, spiral step climber, step climber, rope climber.
Swing Equipment– Two bay swing in brown with two belt seats and two bucket seats in black.
Sports Equipment– Baseball Backstop, (2) Complete Bent Post Basketball Backstop, Court Striping
Amenities– (2) 6’ Rectangular Portable Table in black and green, (2) 6’ bench with back in black and green
Safety Surfacing and Playground Border– Six ounce geotextile fabric for weed control with wood chip surfacing, complete with (55) 12” border timbers and Flush ADA Ramp System.
Project Timeline from Order to Install- 4 months
Full Installation in October 2017 by Noah’s Park & Playgrounds
Project Total: $55,000 – $60,000